Conservation management plan
A conservation management plan (CMP) is a document that helps develop the management strategy for historic assets, sites and places. It explains the significance of the asset and examines how any future use, management, alteration or repair will be carried out in order to retain that significance. It informs the way an asset is conserved and managed, by establishing why the asset matters and what matters about it.
CMPs help to manage the often many different features and diverse interests that need to be considered in relation to historic assets. They are particularly useful for assets such as:
- New buildings in heritage settings.
- Habitats, landscapes or open spaces.
- Spaces in historic buildings.
- Buildings or institutions with heritage assets.
CMPs do not necessarily need to be lengthy documents. Instead they should be compiled and structured so that they can be easily-referenced by those managing the site. Complex sites will often have a range of plans in place already, but these may only focus on one type of heritage, whereas a CMP provides a holistic view, collating issues and plans. A CMP should be well-illustrated, with key issues highlighted in diagrams.
Property teams must work in collaboration to prepare CMPs, with the assistance of expert consultants if necessary. The stages involved in creating a CMP might include:
- Deciding why the CMP is needed and how it will be used.
- Identifying stakeholders.
- Understanding the asset.
- Assessing the significance of the asset.
- Exploring relevant issues.
- Setting policy aims and objectives.
- Implementing the CMP.
- Monitoring and reviewing the CMP.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
IHBC NewsBlog
Historic England Launches Wellbeing Strategy for Heritage
Whether through visiting, volunteering, learning or creative practice, engaging with heritage can strengthen confidence, resilience, hope and social connections.
National Trust for Canada’s Review of 2024
Great Saves & Worst Losses Highlighted
IHBC's SelfStarter Website Undergoes Refresh
New updates and resources for emerging conservation professionals.
‘Behind the Scenes’ podcast on St. Pauls Cathedral Published
Experience the inside track on one of the world’s best known places of worship and visitor attractions.
National Audit Office (NAO) says Government building maintenance backlog is at least £49 billion
The public spending watchdog will need to consider the best way to manage its assets to bring property condition to a satisfactory level.
IHBC Publishes C182 focused on Heating and Ventilation
The latest issue of Context explores sustainable heating for listed buildings and more.
Notre-Dame Cathedral of Paris reopening: 7-8 December
The reopening is in time for Christmas 2025.
Stirling Prize-winning Salford building to be demolished
The Centenary Building will be bulldozed as part of the wider £2.5bn Crescent regeneration project
Volunteers work to transform 100-year-old ‘hidden’ building into bothy
The building, named Druimnashallag, is located southeast of Oban.
The new ‘Arches for HERs’ Demo site, from the Getty Conservation Institute via HE
It shows how organisations responsible for historic environment records (HER) management can benefit from its powerful features.